Final Evaluation

Posted in: EVALUATION
Final Evaluation Report prepared by Kirsten Schneider

Download attachment(s): [ Final_Evaluation_of_Choir_2010.pdf ]


Kirsten's Final Ev Draft1

Posted in: EVALUATION
1st Draft of Final Evaluation
More content to be added
PDF format
Approx 80 pages

Comments by email to Kirsten and/or Kyran

Download attachment(s): [ Kirsten_s_Final_Evaluation_of_Choir_2010.doc ]


CHOIR EVALUATION 2

Posted in: EVALUATION
A document presented as Step 2 of the CHOIR Evaluation process.
It is presented in both .doc and .pdf formats

It is designed to gather information concerning how products were finished for the Common Box

It is presented as an 8 page (A4) document

Partners are invited to complete and return the document to reach Kirsten Schneider not later than 29th January 2010

Download attachment(s): [ CHOIR_Evaluation_2.pdf ] [ CHOIR_Evaluation_2.doc ]


2nd Period Evaluation Template

Posted in: EVALUATION
A Template for Evaluation for the 2nd period of the Choir Project.
This document is presented in a pdf format

It suggests various areas for Evaluation and outlines the deadlines to be applied.
This evaluation has already been circulated directly to the partners

Download attachment(s): [ 2ndPeriodEvaluation.pdf ]


Evaluation August 2009

Posted in: EVALUATION
An Evaluation Document, prepared by Kirsten Schneider at the Half way point of the CHOIR Project.
Is is available as a word document and also as a PDF

Download attachment(s): [ Evaluation_August_09_-_Choir.doc ] [ Evaluation_August_09_-_Choir.pdf ]


Evaluation Report 1

Posted in: EVALUATION
An Evaluation of the Choir Project to May 2009
It is presented in pdf format
It is approximately 50 A4 pages long
The Evaluation contains and analysis of participant's responses, including information presented in Tabular form.
It also contains the Evaluator's Recommendations

Download attachment(s): [ Evaluation_Report_1__Choir.pdf ]


Evaluation Template

Posted in: EVALUATION
A Blank Template Referred to as CHOIR 2008-2010 Evaluation Form 1

Download attachment(s): [ KirstenChoir_2008.pdf ]


Evaluation document2

Posted in: EVALUATION
This is the 2nd Evaluation document presented to the partners by the Evaluator

CHOIR Evaluatiom

Posted in: EVALUATION
EVALUATION By: PEDAGOGIC CENTRE, ALBERTSLUND, COPENHAGEN.
The evaluation of the CHOIR project will be led by the Director of the Pedagogic Centre in Albertslund. The evaluator will remain outside of the normal activities of the project in order to maintain a proper and effective distance from the activities and their outcomes.

Staff at the Pedagogic Centre Albertslund have great experience in the application of evaluation processes which are used in development work with the 8 schools and 37 children day-care institutions in the municipality as well as from former EU school development projects.